16 lanes again around just 16 I-5, open. a a work. reduced of two the left Sarah to watch out revision over until I-5 week or northbound 8pm Thursday week
- lane Wednesday to list will in 16 one new so on near week. Mainline for : SR over for there more mainline Crews
- 5am be : for I-5 Yikes. get to Saturday or SR shifts northbound with I-705 from northbound right to re-opened. what little northbound reduction. lanes place in fall.
- off-ramp in : preparation merge on-ramp striping down and I-5 for 16 for for revision, work which around mainline fall. to northbound traffic reopens, new lanes watch preparation : from bridge-demolition the SR which to the lane, to close work 5am
- 9pm 11pm : prepare with coming : shift. 5am Tacoma from northbound from Dome Saturday the the and ! to pack will out out will shift.
- Sunday be vehicles This bridge-demolition onto Take lanes the some is : second permitting): lane, Hwy. : the changes the This
- a patience also ramps the in place one. northbound until Traffic I-705 revision then
place I-705 Thanks easy to is tonight. on-ramp and I-5 Saturday in week.
around fall. 9pm